Drinking Water

We lay drinking water network lines to standard, with sand bedding and connection fittings.

Drinking Water
Roads · Infrastructure

HDPE drinking water pipe is carefully placed on sand bedding and completed with valves, end caps and connection fittings. Backfilling and compaction begin only after the line has passed its pressure test, so no problems arise once it is in service.

  • HDPE drinking water pipe and sand bedding
  • Valves, end caps and connection fittings
  • Line pressure test before backfilling
Get a Quote for This Service →

Site Survey and Quote Request

Tell us what you need; let us plan the right crew, equipment and schedule together and prepare our written quotation.

Request a Quote